Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 1 de 1
Filter
Add filters








Year range
1.
Article | IMSEAR | ID: sea-220860

ABSTRACT

Introduction: Continuous procurement of various equipments in the hospitals is essential to keep up with global progress of healthcare services. In public sectors, procurement process largely depends on budget sanctions and also by a number of formal procedures and rules which leads to delayed procurement. With this prevalent scenario, the present study was carried out to evaluate the procurement of two major equipments in an apex tertiary care institute using Project Evaluation and Review Technique (PERT). Objective: This study was done to evaluate the procurement of two major equipments using PERT in a tertiary care institute. Method: This study was conducted using Operational Research technique in an apex tertiary care institute i.e., medical college and hospital, in one of the North Eastern states of India. All the procurements related to equipments in that teaching hospital initiated in the financial year 2021 were listed. Out of them, two procurement files were selected by simple random sampling; procurement of Operating Table and Bio Safety cabinet Level – III. Project Evaluation and Review Technique (PERT) was applied to calculate the possible reduction in time in the whole procurement process. Results: The present study showed that procurement of Operating table took 185 days where minimum 8 days could have been saved and procurement of Bio-Safety cabinet Level-III was completed by 702 days where minimum 196 days could have been saved. Conclusion: Application of PERT in this procurement evaluation process can play significant role by calculating critical path and predicting the possible delay.

SELECTION OF CITATIONS
SEARCH DETAIL