Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 3 de 3
Filter
Add filters








Language
Year range
1.
Chinese Medical Equipment Journal ; (6): 108-110, 2009.
Article in Chinese | WPRIM | ID: wpr-405980

ABSTRACT

Medical treatment team plays an important role in improving our logistic support ability. A new idea of how to digitalize medical treatment team together with the foreground and difficulties towards medical treatment digitization is expected under the reality of team information construction and the after thinking about its new construction mode.

2.
Chinese Medical Equipment Journal ; (6)1993.
Article in Chinese | WPRIM | ID: wpr-594685

ABSTRACT

Objective To design a kind of mobile doctor-nurse workstation in order to adapt to medical logistic information construction and improve the ability of medical treatment team under field condition. Methods With using the combination technology such as wireless network, communication, barcode and computer database, the mobile workstation based on 2D barcode at last was developed. Results The workstation can make the field medical treatment team information system towards wireless network and informationization more well and provide the first-hand data for performing treatment and medical care under field condition. Conclusion The application shows that the workstation can be well adapted to the requirement of field condition with quick and high performance characteristic, in addition, the system is convenient, stable and has friendly interface.

3.
Chinese Medical Equipment Journal ; (6)1989.
Article in Chinese | WPRIM | ID: wpr-593566

ABSTRACT

Objective To study way of unloading and positioning of the new type medical shelter. Methods Through repeated testing and practical application, the ways of "3-lines" is used in the ground precession standardization. The first line is guard line of the left marginal of the shelter, the second is allocation line of the end part of the shelter and the third is front wheel alignment line of the whole unloading vehicles. Based on the lines, vehicles carrying shelters access to the ground in accordance with the order of three channel shelters ahead of five functional shelters. Results The real time of the shelter started is reduced to 35min, much lower than the time designed of 4h. Conclusion The application can be carried out precise positioning and improve the speed of the equipment spread.

SELECTION OF CITATIONS
SEARCH DETAIL