Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 1 de 1
Filter
Add filters








Language
Year range
1.
Chinese Journal of Integrated Traditional and Western Medicine in Intensive and Critical Care ; (6): 296-299, 2019.
Article in Chinese | WPRIM | ID: wpr-754559

ABSTRACT

Objective To explore the effect of PDCA [plan (P), design (D), check (C), act (A)] cycle on primary cardiopulmonary resuscitation (CPR) training for medical assistants in hospitals. Methods PDCA cycle was used to enhance continuous quality improvement (CQI) of team members to carry out brain storming to find out the root causes of the training difficulty, and directing to the 3 main root causes: lack of emergency rescue consciousness, without systematic training system and improper education procedure, it was proposed to arrange 3 great strategies: emergency rescue knowledge training, design of systematic training system and proper arrangement of training process. The changes of medical assistants' subjective willingness to perform the first aid, the accurate rates of answering questions on CPR location, frequency, depth, ratio of compression to breathing and awareness degree of CPR before and after training were observed. Results After training, the medical assistants' subjective willingness to perform the first aid was higher than that before training [91.7% (121/132) vs. 2.3% (3/132), P<0.05]. The accurate answer rates on questions concerning CPR basic knowledge, such as location, frequency, depth and compression-breathing ratio had been greatly improved after training compared with those before training [location: 65.2% (86/132) vs. 4.5% (6/132), frequency: 40.2% (53/132) vs. 0 (0/132), depth: 90.2% (119/132) vs. 0 (0/132), compression-breathing ratio: 84.8% (112/132) vs. 1.5% (2/132 ), all P<0.05]. After training, the percentage of medical assistants having very familiar awareness degree of CPR was significantly higher than that before training [65.2% (86/132) vs. 3.0% (4/132), P<0.05]. Conclusion Via CPR training PDCA cycle, not only the efficiency of CPR training management is greatly improved, but also the training effect of participants is significantly elevated.

SELECTION OF CITATIONS
SEARCH DETAIL