Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 5 de 5
Filter
Add filters








Language
Year range
1.
China Medical Equipment ; (12): 125-127, 2017.
Article in Chinese | WPRIM | ID: wpr-613190

ABSTRACT

Objective:To realize the development of processize, dynamic and normalizing of quality control for medical equipment, and increase the rate of submittal for inspection and work efficiency of medical equipment.Methods: Through data management of informationization platform to count the time, quantity and qualified rate of quality control for medical equipment, and to automatically reminded the number of equipment that was submitted to inspect, and to enhance the rate of submittal for inspection.Results: Through the real-time inquiry function of the operation and maintenance system, the work efficiency was enhanced, and the transformation from static state to dynamic state of the process ofcycle quality control for medical equipment was achieved, and the management for detection data of quality control for medical equipment was improved.Conclusion:Through the application of operation and maintenance system, the work efficiency of cycle quality control of medical equipment can be enhanced, and the informationization management of medical equipment can be achieved, and this system is appropriate for the management of medical equipment in all kinds of hospital.

2.
Chinese Medical Equipment Journal ; (6): 134-135,153, 2017.
Article in Chinese | WPRIM | ID: wpr-608005

ABSTRACT

Objective To explore medical equipment support in actual combat training to improve mobile medical unit in medical service support.Methods Combined with the characteristics of actual combat training,the problems and difficulty of medical equipment support were discussed in actual combat training.Results Some measures were put forward for medical equipment support such as cherishing of medical serviceman on equipment,equipment quality control and maintenance beforeutilization,effective protection and fixation,minimization of influence of instable power supply and plan preparation for loading and transport.Conclusion The study on medical equipment support in actual combat training contributes to enhancing medical support ability of mobile medical unit.

3.
China Medical Equipment ; (12): 121-122,123, 2016.
Article in Chinese | WPRIM | ID: wpr-604706

ABSTRACT

Objective:To explore the importance of preventive maintenance (PM) of the medical equipment operation and maintenance management system in hospital quality control module. Methods:By introducing the quality control module of maintenance management system into medical equipment operation, the test data was analysed and medical equipment PM plan was developed. Results:Medical equipment PM plan can effectively reduce the failure rate of equipment, thus guaranteeing the normal operation of the equipment. Conclusion:The application of hospital medical equipment operation and quality control module of maintenance management system, can make more accurate statistics for failure cycle and failure rate of hospital equipment, implement the new PM plan, effectively reduce the failure rate and operation cost of hospital equipment, and improve equipment utilization.

4.
China Medical Equipment ; (12): 82-84,85, 2015.
Article in Chinese | WPRIM | ID: wpr-600921

ABSTRACT

To introduce the treatment methods and weaknesses of the advanced wounds in extensive burns patients, explain the application of ultrasonic debridement in wound repairment. Introduce the treatment equipment of the advanced wounds, and present the idea to combine bath treatment and ultrasonic debridement. To develop a ultrasonic-therapeutic tank. It is important to improve treatment methods of the advanced wounds in extensive burns patients.

5.
Chinese Medical Equipment Journal ; (6)1989.
Article in Chinese | WPRIM | ID: wpr-593566

ABSTRACT

Objective To study way of unloading and positioning of the new type medical shelter. Methods Through repeated testing and practical application, the ways of "3-lines" is used in the ground precession standardization. The first line is guard line of the left marginal of the shelter, the second is allocation line of the end part of the shelter and the third is front wheel alignment line of the whole unloading vehicles. Based on the lines, vehicles carrying shelters access to the ground in accordance with the order of three channel shelters ahead of five functional shelters. Results The real time of the shelter started is reduced to 35min, much lower than the time designed of 4h. Conclusion The application can be carried out precise positioning and improve the speed of the equipment spread.

SELECTION OF CITATIONS
SEARCH DETAIL