Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 2 de 2
Filter
Add filters








Language
Year range
1.
Chinese Journal of Hospital Administration ; (12): 927-931, 2022.
Article in Chinese | WPRIM | ID: wpr-996018

ABSTRACT

The construction and operation of the hospital-wide radiation protection management information system is of great significance for improving the efficiency and quality of radiation protection management. A hospital has built a hospital-wide radiation protection management system, which consisted of four modules: radiation staff management module, protection items management module, site and equipment management module, and self-inspection module. The system adopted B/S mode, carried the lightweight J2EE framework-SpringBoot framework, and used mybatis, which was flexible and practical, as the persistence layer of the system, to store the data completely in the SQLServer database.Java language was used as the system development language, and the front and back-end separation architecture was used. Each of the four modules implemented the management responsibility departments and responsible personnel to carry out the all-round management of radiation protection, and realized the integrated, information-based and standardized management of radiation protection management in the hospital.

2.
Chinese Journal of Practical Nursing ; (36): 2449-2450, 2016.
Article in Chinese | WPRIM | ID: wpr-673042

ABSTRACT

Objective To summarize the nursing experience of 1 case of very low birth weight infant decannulation difficult in PICC. Methods The nursing key points included: full assessment analysis decannulation difficult reason, consult the PICC catheter outpatient health nurses, give magnesium sulfate hydropathic compress, mucopolysaccharide polysulfate cream local besmear outside, sanyrene outside, at the same time give low-molecular-weight heparin calcium injection subcutaneous injection such as anticoagulant active treatment and nursing. Results After 7 days ,the infant left axillary mass dispel, PICC pull out smoothly. Conclusions Decannulation difficult of very low birth weight infant requires full evaluation, multidisciplinary cooperation and specialist consultation, can give targeted personalized nursing safety smooth tube drawing, is worthy of reference for clinic.

SELECTION OF CITATIONS
SEARCH DETAIL