Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 1 de 1
Filtrar
Añadir filtros








Intervalo de año
1.
China Medical Equipment ; (12): 130-130,131, 2013.
Artículo en Chino | WPRIM | ID: wpr-598685

RESUMEN

It reports the E02 breakdown after XG501A program controller starting. The experiences and solutions of the E02 breakdown. According to the breakdown prompt, we carry on the analysis and the overhaul to the gastrointestinal filament preheating circuit. It is able to find the breakdown surely to be at, if you carried on the analysis search according to electric circuit's work flow. You must consider that comprehensive and gradually metrical data in the overhaul process. You cannot take for granted and only then may avoid detouring and equipment's damage.

SELECCIÓN DE REFERENCIAS
DETALLE DE LA BÚSQUEDA