Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 6 de 6
Filtrar
Añadir filtros








Intervalo de año
1.
Chinese Journal of Medical Library and Information Science ; (12): 63-67, 2016.
Artículo en Chino | WPRIM | ID: wpr-498820

RESUMEN

Hospital information construction is a systematic project involving many sectors and specialties,it is thus quite necessary to implement project management in hospitalinformation construction. The problems in hospital in-formation construction were analyzed,the key points and common problems in its project management were presented, and the importance of scientific project management methods used in hospital information construction was pointed out.

2.
Chinese Journal of Medical Library and Information Science ; (12): 56-58,63, 2016.
Artículo en Chino | WPRIM | ID: wpr-604313

RESUMEN

The application of 6 important schedule management steps in construction of hospital information system was described in detail with the information system transform project in Beijing Friendship Hospital as an example. Effective management could assure the progress of project according to the plan and a specific schedule management plan should be worked out by taking into full consideration the overall environment and difficulties of the project due to the various influencing factors. The experiences with schedule management in construction of hospital information system were summarized for its further improvement.

3.
Chinese Journal of Hospital Administration ; (12): 171-175, 2011.
Artículo en Chino | WPRIM | ID: wpr-412431

RESUMEN

The paper described the framework for the hospital to compile its "12th Five-year Plan", including the introduction, status quo analysis, planned objectives, and implementation strategy.The introduction in which needs to pinpoint the strategic objectives of the hospital in five years; the status quo analysis to cover the strengths, weakness, and threats and opportunities faced by the hospital in terms of both internal and external conditions; the planned objectives need to clarify the vision,mission, general goals and targets; and the specific strategies in the end. A scientific and feasible development plan can only be compiled based on conditions of the hospital, scientific rules and framework.

4.
International Journal of Surgery ; (12): 519-521, 2010.
Artículo en Chino | WPRIM | ID: wpr-387808

RESUMEN

Objective To study the pathogen distribution,risk factors and preventive measures in the patients with hospital-acquired septicemia. Methods Retrospective survey was carried out in 52 patients with hospital-acquired septicemia from 2007 to 2009. Results The hospital-acquired septicemia was related to the underlying disease and aggressive procedure. The most bacteria were Gram-negative bacilli and fungemia must be paid attention. Conclusion It is important to reduce the aggressive procedures and reasonably use antibiotics in the prevention of the hospital-acquired septicemia.

5.
Chinese Journal of Nosocomiology ; (24)2006.
Artículo en Chino | WPRIM | ID: wpr-589477

RESUMEN

OBJECTIVE To seek the effective dynamic air disinfector for hospitals,and investigate the effects of JBL nano-meter dynamic air disinfector.METHODS Choosing four different hospitals,using JBL nano-meter dynamic air disinfector device to collect,compare and analyze the data under a human being movement environment or a vacant environment on the basis of the air sampling method taken from Hospital Disinfection Technology Standard(in 2002 edition) issued by the Ministry of Health.RESULTS When all four hospitals using JBL nano-meter dynamic air disinfectors,the average air bacterium-killing rate in a human being movement environment reached 80.35%,which was obviously better than other similar devices.CONCLUSIONS JBL nano-meter dynamic air disinfector not only has very good function of removing the unusual odors,but has excellent active air disinfection effect.Meanwhile,the device can be installed conveniently.It is regarded as one of the best hospital air disinfection devices.

6.
Chinese Journal of Nosocomiology ; (24)2006.
Artículo en Chino | WPRIM | ID: wpr-589227

RESUMEN

OBJECTIVE To observe the sterilization effect of nanometer photocatalysis air sterilizer mounted in hospital.METHODS We carried out a dynamic survey on air average numbers of colony through field experiment and practical operation.RESULTS The field experiment displayed that the air bacterium dissolution rate was 55.64-75.94% and the bacterium content degraded as time extended,after nanometer photocatalysis air sterilizer been used 1-2 h;the result of practical operation in four seasons of the year revealed that the average bacterium colony numbers in each ward region was lower than before sterilizer mounted,the air bacterium dissolution rate was 73-82.3% in the third ward region and 44.5-76.3% in the fourth ward region.CONCLUSIONS It is effective to use the nanometer photocatalysis air sterilizer to sterilize the air in hospital under the condition of inspection.The airflow of the central air conditioning can practice the air sterilization function more validly.

SELECCIÓN DE REFERENCIAS
DETALLE DE LA BÚSQUEDA