Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 1 de 1
Filtrar
Añadir filtros








Intervalo de año
1.
Braz. arch. biol. technol ; 64: e21210138, 2021. graf
Artículo en Inglés | LILACS-Express | LILACS | ID: biblio-1355808

RESUMEN

Abstract The planning of a new thermal power plant is linked to the various decision elements and evaluation criteria. Factors such as the plant's geographic positioning, primary energy supply points, paths, and means of delivery of this primary energy should be analyzed. Similar studies are imposed when studying the change of a thermoelectric plant's primary energy source occurs. In Brazil, several plants are currently investigating the exchange of their primary fuel from oil to gas due to the decrees issued by ANEEL. This paper presents software, which uses virtual reality to assist in the various stages of the planning process and in the analyses that must be performed. This software was developed for the Hidrotermica Group and had as the primary target the Borborema Thermoelectric Power Plant.

SELECCIÓN DE REFERENCIAS
DETALLE DE LA BÚSQUEDA