Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 1 de 1
Filtrar
Añadir filtros








Intervalo de año
1.
Artículo en Chino | WPRIM | ID: wpr-593566

RESUMEN

Objective To study way of unloading and positioning of the new type medical shelter. Methods Through repeated testing and practical application, the ways of "3-lines" is used in the ground precession standardization. The first line is guard line of the left marginal of the shelter, the second is allocation line of the end part of the shelter and the third is front wheel alignment line of the whole unloading vehicles. Based on the lines, vehicles carrying shelters access to the ground in accordance with the order of three channel shelters ahead of five functional shelters. Results The real time of the shelter started is reduced to 35min, much lower than the time designed of 4h. Conclusion The application can be carried out precise positioning and improve the speed of the equipment spread.

SELECCIÓN DE REFERENCIAS
DETALLE DE LA BÚSQUEDA