Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 1 de 1
Filtrar
Añadir filtros








Intervalo de año
1.
Braz. arch. biol. technol ; 61(spe): e18000480, 2018. graf
Artículo en Inglés | LILACS | ID: biblio-974156

RESUMEN

ABSTRACT The present article focuses on the construction of an Intelligent System for the Project Start-Stop Logic of Hydropower Plants, work carried out as master dissertation, allowing the retention of knowledge of previous cases which set a valuable intellectual capital, organizing knowledge generated by specialists and consultants of the area. The tool aims at saving time as well as standardizing solutions, allowing future developments for the construction of other necessary logic (such as those related to asset management and tools to aid the operation and maintenance of hydroelectric power plants). The MyCBR, software that proved to be of easy programming, but with some limitations, is used for such an attempt of a shell of current use. The recovery of the cases based on calculations of global and local similarity allows the selection of solutions already used in hydroelectric plants with analogous technological solutions. The results were satisfactory in view of the periodicity of the use of the tool and the possibility of increasing the case base as the logics are implemented in other projects, besides allowing the inclusion of other logics and documentation pertinent to the Hydropower Plants.


Asunto(s)
Inteligencia Artificial , Centrales Hidroeléctricas/economía , Lógica , Estudios de Casos y Controles
SELECCIÓN DE REFERENCIAS
DETALLE DE LA BÚSQUEDA