Your browser doesn't support javascript.
loading
Montrer: 20 | 50 | 100
Résultats 1 - 1 de 1
Filtre
Ajouter des filtres








Gamme d'année
1.
Chinese Medical Equipment Journal ; (6): 12-16, 2018.
Article Dans Chinois | WPRIM | ID: wpr-700031

Résumé

Objective To design a multi-function first-aid module integrating instruments with the box to solve the existing problems in integration, operation, deployment, withdrawal, environmental adaptability and etc, so as to realize integrated storage, transport and operation of the instruments. Methods The module had its structure, modes of deployment and withdrawal, instruments buffering and vibration isolation, ergonomics and etc designed with the technologies of integrating box and instruments, integration, buffering and vibration isolation, centralized oxygen and power supply as well as the methods of system modeling,structure simulation and CAD.Results The first-aid module was gifted with the functions of respiratory and circulatory rehabilitation,vital signs monitoring,emergency treatment of complex and multi injuries, which could be used as a 2 000 mm×800 mm×600 mm emergency treatment platform when deployed. There were 4 angles for adjusting the backboard to form anti-shock positions for the severe casualties.The module had the time for deployment and withdrawal not more than 5 min,and was easy to deploy,withdraw,transport and store.Conclusion The module behaves well in structure,function,layout,operation and military service when used for the treatment of the severe casualties in the tent-form field medical system,which contributes to enhancing the casualty treatment efficiency and prognosis.[Chinese Medi-cal Equipment Journal,2018,39(5):12-16]

SÉLECTION CITATIONS
Détails de la recherche