Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 1 de 1
Filtrar
Adicionar filtros








Intervalo de ano
1.
Chinese Medical Journal ; (24): 645-649, 2003.
Artigo em Inglês | WPRIM | ID: wpr-324444

RESUMO

<p><b>OBJECTIVE</b>To determine a network solution to meet the network requirements of the heavy data flow, load balance, and potential network storms from expansion of picture archiving and communication system (PACS) application.</p><p><b>METHODS</b>Intel Netstructure 480T Giga Switch was used as the main switch and connected to each building by fiber channel at 1 Giga speed to archive 100 MB/s to each port. At the same time, the in-dependence of the original network construction was physically kept. The layer 3 and 4 switchers were used as load balance to reduce the heavy load of the network, and all the cabling for PACS used the super CAT5 along with the Intel NetStructure 1520 to prepare for potential network storms.</p><p><b>RESULTS</b>An advanced intranet was set up to fully meet the high standard requirement of the PACS. The foundation for upgrading the whole network system to 1 Giga application was built to achieve sharing and transmission of images, information, and patient data within the hospital. The base was established for the standardized management of the hospital.</p><p><b>CONCLUSION</b>Good planning is the first step in setting up PACS, and the equipment forms the necessary platform to run PACS and all kinds of hospital information system (HIS). The networking construction is the foundation of e-hospital.</p>


Assuntos
Redes de Comunicação de Computadores , Desenho de Equipamento , Sistemas de Informação Hospitalar , Sistemas de Informação em Radiologia
SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA