Your browser doesn't support javascript.
loading
Reducción del Riesgo en Equipos Biomédicos y en Instalaciones Eléctricas de Entornos Clínicos / Risk Reduction in Electrical Networks and Safety of Biomedical Equipment in Clinical Settings
Arregui, M.; Alfaro, N.; Baldizzoni, M.; Wald, I.; Gambogi, R.; Ferreira, A.; Simini, F..
  • Arregui, M.; Universidad de la República. UY
  • Alfaro, N.; Universidad de la República. UY
  • Baldizzoni, M.; Institución Fondo Nacional de Recursos. UY
  • Wald, I.; Institución Fondo Nacional de Recursos. UY
  • Gambogi, R.; Institución Fondo Nacional de Recursos. UY
  • Ferreira, A.; Institución Fondo Nacional de Recursos. UY
  • Simini, F.; Universidad de la República. UY
Rev. mex. ing. bioméd ; 40(1): e201822, Jan.-Apr. 2019. tab, graf
Article in Spanish | LILACS | ID: biblio-1043130
RESUMEN
Resumen Se analizan 112 auditorías de instalaciones eléctricas y seguridad de equipos biomédicos en 78 Institutos de Medicina Altamente Especializada (IMAE) del Uruguay, realizadas a lo largo de 14 años, clasificando el nivel de riesgo y de cumplimiento de normas desde el punto de vista de Ingeniería Clínica. Cada visita incluye una encuesta al personal encargado de mantener y gestionar la infraestructura eléctrica y el equipamiento biomédico, que abarca el estado de mantenimiento, el control y la documentación de las instalaciones eléctricas y del equipamiento biomédico. Se evalúa el riesgo con un puntaje de 0 a 4. En 2004-2007 el 74% de los IMAE tenía irregularidades en la instalación eléctrica, gestión de equipamiento, control de calidad o documentación. Además, un 15% de los que tenían problemas, tenía en particular equipamiento indicado como "equipo peligroso". En los períodos siguientes esta proporción baja paulatinamente hasta 0% en 2016-2017. No obstante, continúa existiendo un déficit en la gestión del equipamiento y en la documentación formal. El aporte de la Universidad en el seguimiento técnico de los IMAE se ha materializado en una mejora en materia de seguridad.
ABSTRACT
Abstract 112 field inspections to 78 high technology medical centers (IMAE is the Spanish acronym) over 14 years are analyzed. All visits were evaluated as to Clinical Engineering good practices and were assigned a risk level. All audits included a questionaire to maintenance management personnel on electrical network operation as well as on biomedical equipment follow-up and documentation from acquisition to disposal. Risk is assigned a level 0 to 4 at each visit. In 2004-2007, 74% of IMAEs had safety problems in one or more of electrical network, maintenance management or documentation, and 15% of the IMAEs with safety problems had one piece of equipment described as simply "dangerous". Electrical safety problems were eventually reduced to 0% in 2016-2017, probably as a consequence of regular audit and counseling by this University Clinical Engineering Program.


Full text: Available Index: LILACS (Americas) Type of study: Etiology study / Risk factors Language: Spanish Journal: Rev. mex. ing. bioméd Journal subject: Biomedical Engineering Year: 2019 Type: Article Affiliation country: Uruguay Institution/Affiliation country: Institución Fondo Nacional de Recursos/UY / Universidad de la República/UY

Similar

MEDLINE

...
LILACS

LIS


Full text: Available Index: LILACS (Americas) Type of study: Etiology study / Risk factors Language: Spanish Journal: Rev. mex. ing. bioméd Journal subject: Biomedical Engineering Year: 2019 Type: Article Affiliation country: Uruguay Institution/Affiliation country: Institución Fondo Nacional de Recursos/UY / Universidad de la República/UY