Your browser doesn't support javascript.
loading
Processo de implantação dos sistemas de logística reversa de equipamentos eletroeletrônicos previstos na Política Nacional de Resíduos Sólidos: uma visão dos gestores / Reverse Logistics of Electrical and Electronic Equipment of the National Solid Waste Policy Deployment Process perceptions of managers
São Paulo; s.n; 2014. 98 p. ilus, tab.
Thesis in Portuguese | LILACS | ID: lil-774150
RESUMO
A viabilização da coleta e destinação correta dos resíduos pós-consumo é prevista pela Política Nacional de Resíduos Sólidos (PNRS) - Lei n°12.305 de 2010-importante marco regulatório para a gestão ambiental no Brasil. Dentre diversos aspectos enunciados, destacam-se o princípio da responsabilidade compartilhada pelo ciclo de vida dos produtos e o instrumento logística reversa. O art. 33 desta lei considera prioritária a implantação de sistemas de logística reversa (SLR) para seis classes de resíduos, dentre eles os resíduos de equipamentos eletroeletrônicos (REEE).

Objetivos:

analisar e caracterizar o discurso de gestores do comércio, da indústria, do poder público e das cooperativas, relacionados com o setor de eletroeletrônicos sobre a implantação de SLR.

Métodos:

Foram realizadas entrevistas semiestruturadas com nove gestores envolvidos no processo de implantação de SLR de eletroeletrônicos. Os dados foram transcritos, categorizados e posteriormente analisados pelo software Classification Hiérarchique Classificatoire et Cohésitive - CHIC®. O modelo dos múltiplos fluxos foi utilizado para auxiliar no entendimento do processo de formação da PNRS.

Resultados:

foram obtidas sete árvores hierárquicas de similaridade e quatro grupos com diferentes forças de implicação.

Conclusão:

Os pontos relevantes identificados mostram que 1) o Acordo Setorial foi o instrumento escolhido para implantação de SLR de REEE, mas existem entraves entre os setores privado e público...
ABSTRACT
The feasibility of collection and proper disposal of post-consumer waste is provided by the National Solid Waste Policy (PNRS) - Law n° 12.305 2010-important regulatory framework for environmental management in Brazil. Among several aspects listed, highlight the principle of shared responsibility for the lifecycle of products and reverse logistics tool. The art. 33 of this law considers a priority the implementation of reverse logistics systems (SLR) for six classes of waste, including waste electrical and electronic equipment (WEEE).

Objectives:

To analyze and characterize the speech of managers of trade, industry, public authorities and cooperatives, related to consumer electronics over the implementation of SLR.

Methods:

Semi-structured interviews were conducted with nine managers involved in the implementation of electronic SLR process. Data were transcribed, categorized and analyzed using the software Classification Hierarchique Classificatoire et Cohésitive - CHIC®. The model of "multiple streams" was used to assist in understanding the process of formation of PNRS.

Results:

seven hierarchical trees of similarity and four groups with different forces of implication were obtained.

Conclusion:

The relevant points identified show that 1) the 'Sectoral Agreement' was the instrument chosen for the implementation of the WEEEs SLR, but there are barriers between the private and public sectors, generating delays in signing the agreement...
Subject(s)
Full text: Available Index: LILACS (Americas) Main subject: Organization and Administration / Social Responsibility / Scrap Iron / Electrical Equipment and Supplies / Electronic Waste Type of study: Qualitative research Country/Region as subject: South America / Brazil Language: Portuguese Year: 2014 Type: Thesis

Similar

MEDLINE

...
LILACS

LIS

Full text: Available Index: LILACS (Americas) Main subject: Organization and Administration / Social Responsibility / Scrap Iron / Electrical Equipment and Supplies / Electronic Waste Type of study: Qualitative research Country/Region as subject: South America / Brazil Language: Portuguese Year: 2014 Type: Thesis