The building and application of Bank-hospital connection system / 中国医学装备
China Medical Equipment
;
(12): 51-53, 2015.
Article
in Chinese
| WPRIM
| ID: wpr-474011
ABSTRACT
Objective:
Through the construction of the Bank-Hospital connecting project, the enduring problems in clinic such as the long waiting time at registration, check out, payment, and other non-clinic issues are solved. Meanwhile, the clinic medication procedure is further regulated, which provides a faster medical assistance service for patients and elevates the ability to apply medical informationization.Methods:
Based on the current HIS platform, the banking and mobile systems connected as a whole network and constructed the banking-medication platform.Results:
The waiting time of patients is largely reduced by expanding the channels of registration, applying multiple cards as medication card, and introducing local charging, self-payment systems at every floor, and mobile intelligent platform.Conclusion:
The Bank-Hospital connecting project brings convenience to patients and increases our efficiency.
Full text:
Available
Index:
WPRIM (Western Pacific)
Language:
Chinese
Journal:
China Medical Equipment
Year:
2015
Type:
Article
Similar
MEDLINE
...
LILACS
LIS