Your browser doesn't support javascript.
loading
Application Effect of Weekly Maintenance Together for Detection Equipment by Persons Specifically Designated / 现代检验医学杂志
Journal of Modern Laboratory Medicine ; (4): 161-164, 2016.
Article in Chinese | WPRIM | ID: wpr-487848
ABSTRACT
Objective To explore the application effect of weekly maintenance together for detection equipment by persons specifically designated.Methods Firstly carries on the preliminary training and the organization of the examination for all junior technicians and nurses,the appropriate persons were selected.Secondly,the recruited personnel were trained and as-sessed by the manufacturer or equipment engineers.After obtaining a certificate of conformity,weekly centralized mainte-nance for detection equipment officially began to implement in August 2014.Maintenance time was designated as every Wednesday afternoon or evening.Two months after the operation the test carried out by the head of clinical laboratory and the equipment department engineers in strict accordance with the week maintenance prcedures for each instrument and each item,and on-site questions.Other personnel also participated in the test as a control group.After half a year,the question-naire was sent to all the inspectors,and the satisfaction rate about the maintenance of the instrument was counted.Results Seven personnel selected to participate in the weekly maintenance,includings two senior technicians,three technicians and two nurses.Experimental personnel BC5390,UF-1000i,BH5100Plus and BH2100,C8000 and i2000,ADVIA2400 average score was significantly higher than the control group.Before and after the programme,the average number of failures of the instrument was reduced from 22 to 8 times and the average satisfaction rate of the inspection personnel was 83.0%±5.0%and 98.0%±2.0% respectively,and the difference was statistically significant.Conclusion Weekly centralized maintenance for detection equipment by persons specifically designated can truly implement instrument maintenance requirements,and at the same time with the implementation of the program,the failure times is greatly reduced,which is beneficial to improve the quality of inspection and to avoid the medical risks caused by TAT.

Full text: Available Index: WPRIM (Western Pacific) Type of study: Diagnostic study Language: Chinese Journal: Journal of Modern Laboratory Medicine Year: 2016 Type: Article

Similar

MEDLINE

...
LILACS

LIS

Full text: Available Index: WPRIM (Western Pacific) Type of study: Diagnostic study Language: Chinese Journal: Journal of Modern Laboratory Medicine Year: 2016 Type: Article