Your browser doesn't support javascript.
Research on the Scheduling of Tractors in the Major Epidemic to Ensure Spring Ploughing
Mathematical Problems in Engineering ; : 1-11, 2021.
Article in English | Academic Search Complete | ID: covidwho-1322858
ABSTRACT
When the outbreak of COVID-19 began, people could not go out. It was not allowed to provide agricultural machinery services in different places across regions to reduce the flow and gathering of people. Improvement of utilization efficiency of agricultural machinery resources is required through scientific scheduling of agricultural machinery. With seizing the farming season and stabilizing production as the goal, this paper studied the scientific scheduling of tractors within the scope of town and established agricultural machinery operation scheduling model with the minimization of total scheduling cost as the optimization objective. Factors such as farmland area, agricultural machinery, and farmland location information and operating time window are considered in this model to improve the accuracy of the agricultural machinery operation scheduling model. The characteristics of multiple scheduling algorithms are analyzed comprehensively. The scheduling requirements of agricultural machinery operation to ensure spring ploughing are combined to design the agricultural machinery scheduling algorithm based on the SA algorithm. With Hushu Street, Jiangning District, Nanjing City, as an example, a comparative experiment is conducted on the simulated annealing algorithm (SA) designed in this paper and the empirical algorithm and genetic algorithm (GA). The results suggest that the total cost of the scheduling scheme generated by the SA algorithm is 19,042.07 yuan lower than that by the empirical scheduling algorithm and 779.19 yuan lower than that by the genetic algorithm on average. Compared with the GA algorithm, the transfer distance, waiting cost, and delay cost of the SA algorithm are reduced by 11.6%, 100%, and 98.1% on average, indicating that the transfer distance of agricultural machinery in the scheduling scheme generated by the SA algorithm is shorter, so is the waiting and delay time. Meanwhile, it can effectively obtain the near-optimal solution that meets the time window constraint, with good convergence, stability, and adaptability. [ABSTRACT FROM AUTHOR] Copyright of Mathematical Problems in Engineering is the property of Hindawi Limited and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)

Full text: Available Collection: Databases of international organizations Database: Academic Search Complete Language: English Journal: Mathematical Problems in Engineering Year: 2021 Document Type: Article

Similar

MEDLINE

...
LILACS

LIS


Full text: Available Collection: Databases of international organizations Database: Academic Search Complete Language: English Journal: Mathematical Problems in Engineering Year: 2021 Document Type: Article