Your browser doesn't support javascript.
Construction Plan for Backup Dispatch of Regional Power Grid
7th Asia Conference on Power and Electrical Engineering, ACPEE 2022 ; : 570-575, 2022.
Article in English | Scopus | ID: covidwho-1932059
ABSTRACT
Emergencies such as the COVID-19 and natural disasters have brought severe ordeals to the current grid emergency dispatch system, and there is an urgent need to improve and consummate the existing backup dispatch system. This paper firstly analyzes the existing three kinds of backup dispatch systems and their advantages and disadvantages, and then compares in detail the construction of national dispatch, provincial dispatch, and prefectural dispatch, and points out several existing problems of backup dispatch at all levels under the current emergency system. In order to gradually solve these problems, a backup dispatch system combining emergency and disaster recovery has been proposed based on the two-place three-center mode, it gradually realizes the prevention of risks from social security incidents such as public health incidents and serious natural disasters. © 2022 IEEE.
Keywords

Full text: Available Collection: Databases of international organizations Database: Scopus Language: English Journal: 7th Asia Conference on Power and Electrical Engineering, ACPEE 2022 Year: 2022 Document Type: Article

Similar

MEDLINE

...
LILACS

LIS


Full text: Available Collection: Databases of international organizations Database: Scopus Language: English Journal: 7th Asia Conference on Power and Electrical Engineering, ACPEE 2022 Year: 2022 Document Type: Article