Ampliación de oficinas y depósitos de URES-Tarija
Mitru Tejerina, Luis.
La Paz; s.n; jul. 2001. 20 p. ilus.
No convencional en Español | LIBOCS, LIBOSP | ID: biblio-1301121
Documentos relacionados
Consumers fueling outpatient construction.
The Ethics of Smart Stadia: A Stakeholder Analysis of the Croke Park Project.
Fieldwork: The great outdoors.
Taking the LEED. Hospitals and health systems continue to make strides toward 'greener' facility design and construction featuring reduced energy consumption.
4 ways that clinical lab designs are changing.
Rushing for trauma centers. Better financing drives a building boomlet in Level I trauma centers.
Designing homes to welcome refugees.
The convergence of architectural design and health.
The Future of Healing Gardens.
Construction. Building for the future.