Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 2 de 2
Filter
Add more filters










Database
Language
Publication year range
1.
BMJ Health Care Inform ; 30(1)2023 Mar.
Article in English | MEDLINE | ID: mdl-36863764

ABSTRACT

OBJECTIVE: The WHO developed a manual outlining the preliminary organizational and health professionals' readiness to implement electronic medical records (EMR). On the other hand, the readiness assessment in Ethiopia only includes the evaluation of health professionals, leaving out organisational readiness components. As a result, this research aimed to determine health professionals' and organizational readiness to implement EMR at a specialized teaching hospital. METHODS: An institutional-based cross-sectional study design was conducted among 423 health professionals and 54 managers. Self-administered and pretested questionnaires were used to collect data. Binary logistic regression analysis was used to identify factors associated with health professionals' readiness for EMR implementation. An OR with a 95% CI and p<0.05 was used to determine the strength of the association and the statistical significance, respectively. RESULTS: In this study, 53.7% management capacity, 33.3% finance and budget capacity, 42.6% operational capacity, 37.0% technology capability and 53.7% organisational alignment among the five dimensions evaluated to assess an organisation's readiness to implement an EMR system. Of 411 health professionals in this study, 173 (42.1%) with (95 CI 37.3% to 46.8%) were ready to implement an EMR system at the hospital. Sex (AOR 2.69, 95% CI 1.73 to 4.18), basic computer training (AOR 1.59, 95% CI 1.02 to 2.46), knowledge of EMR (AOR 1.88, 95% CI 1.19 to 2.97) and attitudes towards EMR (AOR 1.65, 95% CI 1.05 to 2.59) were significantly associated with health professionals' readiness towards EMR system implementation. CONCLUSIONS: Findings showed that most dimensions of organizational readiness for EMR implementation were below 50%. This study also revealed a lower level of EMR implementation readiness among health professionals compared with previous research studies' results. To improve organisational readiness to implement an electronic medical record system, a focus on management capability, financial and budget capability, operational capability, technical capability and organisational alignment was crucial. Likewise, having basic computer training, giving special attention to female health professionals and improving health professionals' knowledge of and attitudes towards EMR could help improve the readiness level of health professionals for implementing an EMR system.


Subject(s)
Electronic Health Records , Health Facilities , Humans , Female , Cross-Sectional Studies , Ethiopia , Hospitals, Teaching
2.
PLoS One ; 17(9): e0274090, 2022.
Article in English | MEDLINE | ID: mdl-36149905

ABSTRACT

INTRODUCTION: Family planning program is low-cost and an effective way to lower maternalmortality by reducing the number of high-risk births. Despite the effectiveness of the program, availability of materials, equipment and trained healthcare providers were some of the challenges in sub-Saharan African countries including Ethiopia. Determining the implementation status and identifying gaps is the aim of this evaluation. METHOD: A facility-based cross-sectional evaluation design with mixed method approach was employed. Quantitative data was collected through the exit interview of 477 clients from March 25-April 25, 2020. The evaluation focused on three dimensions: availability, compliance, and acceptability with multiple data sources. The quantitative data were entered in to Epi-data version 4.6 and exported to SPSS version 25 for analysis. Multivariable logistic regression was done to determine factors associated with client satisfaction. The qualitative data were transcribed, translated and analyzed by using thematic analysis. The evaluation finding was computed and compared with the preset criteria for the final judgment. RESULT: The majority of the health care providers (69.8%) got family planning training in the past two years. Three health facilities (37.5%) had 24hrs electricity with backup generators whereas only 25% of the health facilities had functional piped water inside the service room. Only two (25%) health facilities had a separate room for family planning service and 37.5% of health facilities had national FP guidelines. The overall availability of required resources for family planning service at Gondar city public facilities were 62.1%. Only twenty one (26.3%) of health providers dressed based on dressing code of ethics and none of them had ID during our observation. The overall compliance level of health care providers during providing family planning services were 75.5%. About 53.9% of the clients were satisfied with family planning service provided at Gondar city public health facilities.-and-were significantly associated variables with client satisfaction. CONCLUSION: The overall implementation of family planning service in Gondar city public health facilities with the three evaluation dimensions were judged as fair based on pre-setting judgment matrix. It is better to improve the service through training of healthcare providers, distributed family planning guidelines to health facilities and shortening of waiting time for service.


Subject(s)
Family Planning Services , Health Facilities , Cross-Sectional Studies , Ethiopia , Humans , Water
SELECTION OF CITATIONS
SEARCH DETAIL
...