Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 6 de 6
Filter
Add more filters










Database
Language
Publication year range
1.
J Environ Manage ; 345: 118936, 2023 Nov 01.
Article in English | MEDLINE | ID: mdl-37688956

ABSTRACT

Climate action planning continues to accelerate rapidly across the globe as communities seek to prepare to thrive in an uncertain future. Climate action planning is a particularly contentious and complex topic in the southern United States, however, because of significant economic reliance on industries that contribute substantially to greenhouse gas emissions, and due to a complicated relationship between industry and persistent racial and economic inequities that contribute to distrust between communities, businesses, and state governments. Within the last decade, research efforts have begun to evaluate approaches used to develop city, state, and national-level climate action plans, finding that planning efforts are often as diverse as the localities they represent. Climate action planning processes that evaluate the potential implications of climate action on greenhouse gas emissions and societal values are often driven by either qualitative stakeholder engagement or by the results of numerical models. While both approaches are valuable, they also have limitations that can result in climate action plans that are unrealistic or unimplementable. Limited research is available that assesses planning efforts that integrate multiple evaluation methodologies. In this study, we evaluate the strengths and limitations of integrating qualitative and quantitative climate action evaluation methodologies in a planning process grounded in structured decision making using Louisiana as a case study. This mixed method planning approach applied both quantitative numerical models and qualitative expert elicitation to evaluate potential implications of climate action for Louisiana. We found that integration of approaches through a transparent, structured, and objectives-orientated process allowed for robust analysis of potential climate actions while engendering process buy-in across diverse stakeholder interests. This process ultimately resulted in the unanimous adoption of Louisiana's climate action plan, characterized by a wholistic and implementable set of climate actions balanced against the values of Louisianians. The process outlined in this study represents a replicable approach for other climate action planning efforts.


Subject(s)
Greenhouse Gases , Louisiana , Climate , Commerce , Uncertainty
2.
J Environ Manage ; 183(Pt 3): 497-509, 2016 Dec 01.
Article in English | MEDLINE | ID: mdl-27623362

ABSTRACT

Coastal ecosystem management typically relies on subjective interpretation of scientific understanding, with limited methods for explicitly incorporating process knowledge into decisions that must meet multiple, potentially competing stakeholder objectives. Conversely, the scientific community lacks methods for identifying which advancements in system understanding would have the highest value to decision-makers. A case in point is barrier island restoration, where decision-makers lack tools to objectively use system understanding to determine how to optimally use limited contingency funds when project construction in this dynamic environment does not proceed as expected. In this study, collaborative structured decision-making (SDM) was evaluated as an approach to incorporate process understanding into mid-construction decisions and to identify priority gaps in knowledge from a management perspective. The focus was a barrier island restoration project at Ship Island, Mississippi, where sand will be used to close an extensive breach that currently divides the island. SDM was used to estimate damage that may occur during construction, and guide repair decisions within the confines of limited availability of sand and funding to minimize adverse impacts to project objectives. Sand was identified as more limiting than funds, and unrepaired major breaching would negatively impact objectives. Repairing minor damage immediately was determined to be generally more cost effective (depending on the longshore extent) than risking more damage to a weakened project. Key gaps in process-understanding relative to project management were identified as the relationship of island width to breach formation; the amounts of sand lost during breaching, lowering, or narrowing of the berm; the potential for minor breaches to self-heal versus developing into a major breach; and the relationship between upstream nourishment and resiliency of the berm to storms. This application is a prototype for using structured decision-making in support of engineering projects in dynamic environments where mid-construction decisions may arise; highlights uncertainty about barrier island physical processes that limit the ability to make robust decisions; and demonstrates the potential for direct incorporation of process-based models in a formal adaptive management decision framework.


Subject(s)
Decision Making , Environmental Restoration and Remediation/methods , Islands , Animals , Cost-Benefit Analysis , Ecosystem , Environmental Restoration and Remediation/economics , Gulf of Mexico , Humans , Mississippi , Uncertainty
3.
Mar Pollut Bull ; 96(1-2): 344-55, 2015 Jul 15.
Article in English | MEDLINE | ID: mdl-25956438

ABSTRACT

Weathered oil can mix with sediment to form heavier-than-water sand and oil agglomerates (SOAs) that can cause beach re-oiling for years after a spill. Few studies have focused on the physical dynamics of SOAs. In this study, artificial SOAs (aSOAs) were created and deployed in the nearshore, and shear stress-based mobility formulations were assessed to predict SOA response. Prediction sensitivity to uncertainty in hydrodynamic conditions and shear stress parameterizations were explored. Critical stress estimates accounting for large particle exposure in a mixed bed gave the best predictions of mobility under shoaling and breaking waves. In the surf zone, the 10-cm aSOA was immobile and began to bury in the seafloor while smaller size classes dispersed alongshore. aSOAs up to 5 cm in diameter were frequently mobilized in the swash zone. The uncertainty in predicting aSOA dynamics reflects a broader uncertainty in applying mobility and transport formulations to cm-sized particles.


Subject(s)
Environmental Monitoring , Petroleum Pollution/analysis , Petroleum/analysis , Silicon Dioxide/chemistry , Hydrodynamics , Models, Chemical , Weather
4.
Deep Sea Res 2 Top Stud Oceanogr ; 103: 79-95, 2014 May 01.
Article in English | MEDLINE | ID: mdl-25288829

ABSTRACT

Cysts of Alexandrium fundyense, a dinoflagellate that causes toxic algal blooms in the Gulf of Maine, spend the winter as dormant cells in the upper layer of bottom sediment or the bottom nepheloid layer and germinate in spring to initiate new blooms. Erosion measurements were made on sediment cores collected at seven stations in the Gulf of Maine in the autumn of 2011 to explore if resuspension (by waves and currents) could change the distribution of over-wintering cysts from patterns observed in the previous autumn; or if resuspension could contribute cysts to the water column during spring when cysts are viable. The mass of sediment eroded from the core surface at 0.4 Pa ranged from 0.05 kg m-2 near Grand Manan Island, to 0.35 kg m-2 in northern Wilkinson Basin. The depth of sediment eroded ranged from about 0.05 mm at a station with sandy sediment at 70 m water depth on the western Maine shelf, to about 1.2 mm in clayey-silt sediment at 250 m water depth in northern Wilkinson Basin. The sediment erodibility measurements were used in a sediment-transport model forced with modeled waves and currents for the period October 1, 2010 to May 31, 2011 to predict resuspension and bed erosion. The simulated spatial distribution and variation of bottom shear stress was controlled by the strength of the semi-diurnal tidal currents, which decrease from east to west along the Maine coast, and oscillatory wave-induced currents, which are strongest in shallow water. Simulations showed occasional sediment resuspension along the central and western Maine coast associated with storms, steady resuspension on the eastern Maine shelf and in the Bay of Fundy associated with tidal currents, no resuspension in northern Wilkinson Basin, and very small resuspension in western Jordan Basin. The sediment response in the model depended primarily on the profile of sediment erodibility, strength and time history of bottom stress, consolidation time scale, and the current in the water column. Based on analysis of wave data from offshore buoys from 1996 to 2012, the number of wave events inducing a bottom shear stress large enough to resuspend sediment at 80 m ranged from 0 to 2 in spring (April and May) and 0 to 10 in winter (October through March). Wave-induced resuspension is unlikely in water greater than about 100 m deep. The observations and model results suggest that a millimeter or so of sediment and associated cysts may be mobilized in both winter and spring, and that the frequency of resuspension will vary interannually. Depending on cyst concentration in the sediment and the vertical distribution in the water column, these events could result in a concentration in the water column of at least 104 cysts m-3. In some years, resuspension events could episodically introduce cysts into the water column in spring, where germination is likely to be facilitated at the time of bloom formation. An assessment of the quantitative effects of cyst resuspension on bloom dynamics in any particular year requires more detailed investigation.

5.
Mar Pollut Bull ; 80(1-2): 200-9, 2014 Mar 15.
Article in English | MEDLINE | ID: mdl-24503377

ABSTRACT

Heavier-than-water sand and oil agglomerates that formed in the surf zone following the Deepwater Horizon oil spill continued to cause beach re-oiling 3years after initial stranding. To understand this phenomena and inform operational response now and for future spills, a numerical method to assess the mobility and alongshore movement of these "surface residual balls" (SRBs) was developed and applied to the Alabama and western Florida coasts. Alongshore flow and SRB mobility and potential flux were used to identify likely patterns of transport and deposition. Results indicate that under typical calm conditions, cm-size SRBs are unlikely to move alongshore, whereas mobility and transport is likely during storms. The greater mobility of sand compared to SRBs makes burial and exhumation of SRBs likely, and inlets were identified as probable SRB traps. Analysis of field data supports these model results.


Subject(s)
Petroleum Pollution/analysis , Petroleum/analysis , Water Movements , Water Pollutants, Chemical/analysis , Alabama , Bays/chemistry , Environmental Monitoring , Florida , Geologic Sediments/chemistry , Models, Chemical , Petroleum Pollution/statistics & numerical data , Silicon Dioxide/chemistry
6.
Deep Sea Res 2 Top Stud Oceanogr ; 103: 96-111, 2014 May.
Article in English | MEDLINE | ID: mdl-26045635

ABSTRACT

The life cycle of Alexandrium fundyense in the Gulf of Maine includes a dormant cyst stage that spends the winter predominantly in the bottom sediment. Wave-current bottom stress caused by storms and tides induces resuspension of cyst-containing sediment during winter and spring. Resuspended sediment could be transported by water flow to different locations in the Gulf and the redistribution of sediment containing A. fundyense cysts could alter the spatial and temporal manifestation of its spring bloom. The present study evaluates model near-bottom flow during storms, when sediment resuspension and redistribution are most likely to occur, between October and May when A. fundyense cells are predominantly in cyst form. Simulated water column sediment (mud) concentrations from representative locations of the Gulf are used to initialize particle tracking simulations for the period October 2010-May 2011. Particles are tracked in full three-dimensional model solutions including a sinking velocity characteristic of cyst and aggregated mud settling (0.1 mm s-1). Although most of the material was redeposited near the source areas, small percentages of total resuspended sediment from some locations in the western (~4%) and eastern (2%) Maine shelf and the Bay of Fundy (1%) traveled distances longer than 100 km before resettling. The redistribution changed seasonally and was sensitive to the prescribed sinking rate. Estimates of the amount of cysts redistributed with the sediment are small compared to the inventory of cysts in the upper few centimeters of sediment.

SELECTION OF CITATIONS
SEARCH DETAIL
...