Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 4 de 4
Filter
Add more filters










Database
Language
Publication year range
4.
Implant Dent ; 17(2): 176-81, 2008 Jun.
Article in English | MEDLINE | ID: mdl-18545049

ABSTRACT

This case report describes the placement of a large-diameter implant at the time of a maxillary molar extraction in conjunction with a simultaneous oroantral communication (OAC) repair and an intraosteotomy lift and the 5-year postloading follow-up. Literature exists supporting the efficacy of immediate implant placement using both conventional and modified insertion techniques. However, no reports detail the repair of an OAC concomitantly with immediate implant insertion. The OAC was repaired by first placing multiple layers of a collagen matrix through the socket, followed by grafting with a mixture of freeze-dried demineralized bone and calcium sulfate, simultaneous obliteration and reshaping of the socket using implant shape-specific osteotomes, and immediate placement of a Frialait-2 6.5-mm-diameter implant. No flap elevation was performed and no membranes were placed. A radiograph taken 5 year after loading showed a stable implant in conjunction with a new maxillary sinus bony floor.


Subject(s)
Dental Implantation, Endosseous/methods , Oral Surgical Procedures/methods , Oroantral Fistula/surgery , Radicular Cyst/complications , Tooth Socket/surgery , Aged , Bone Substitutes , Bone Transplantation , Dental Implants, Single-Tooth , Female , Follow-Up Studies , Humans , Membranes, Artificial , Molar/surgery , Oroantral Fistula/etiology , Time Factors , Tooth Extraction
SELECTION OF CITATIONS
SEARCH DETAIL
...