Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 2 de 2
Filter
Add more filters











Database
Language
Publication year range
1.
Rev Sci Instrum ; 83(2): 02A316, 2012 Feb.
Article in English | MEDLINE | ID: mdl-22380163

ABSTRACT

The production of rare radioactive ion beam (RIB) far from the valley of stability is one of the final purposes of the Spiral2 facility in Caen. The RIB will be produced by impinging a deuteron beam onto a carbon sample to produce a high neutron flux, which will interact with a uranium target. The primary deuteron beam is produced by an ion source based on ECR plasma generation. The deuteron source and the low energy beam transport (LEBT) has been assembled and tested at CEA Saclay. Diagnostics from other laboratories were implemented on the LEBT in order to characterize the deuteron beam produced and compare it to the initial simulations. The ion source has been based on a SILHI-type source, which has demonstrated good performances in pulsed and continuous mode, and also a very good reliability on long term operation. The 5 mA of deuteron beam required at the RFQ entrance is extracted from the plasma source at the energy of 40 kV. After a brief description of the experimental set-up, this article reports on the first beam characterization experiments.

2.
Rev Sci Instrum ; 83(2): 02A345, 2012 Feb.
Article in English | MEDLINE | ID: mdl-22380192

ABSTRACT

In the framework of the IFMIF-EVEDA project (International Fusion Materials Irradiation Facility-Engineering Validation and Engineering Design Activities), CEA∕IRFU is in charge of the design, construction, and characterization of the 140 mA continuous deuteron injector, including the source and the low energy beam line. The electron cyclotron resonance ion source which operates at 2.45 GHz is associated with a 4-electrode extraction system in order to minimize beam divergence at the source exit. Krypton gas injection is foreseen in the 2-solenoid low energy beam line. Such Kr injection will allow reaching a high level of space charge compensation in order to improve the beam matching at the radio frequency quadrupole (RFQ) entrance. The injector construction is now completed on the Saclay site and the first plasma and beam production has been produced in May 2011. This installation will be tested with proton and deuteron beams either in pulsed or continuous mode at Saclay before shipping to Japan. In this paper, after a brief description of the installation, the preliminary results obtained with hydrogen gas injection into the plasma chamber will be reported.

SELECTION OF CITATIONS
SEARCH DETAIL