Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 2 de 2
Filter
Add more filters










Database
Language
Publication year range
1.
Data Brief ; 54: 110472, 2024 Jun.
Article in English | MEDLINE | ID: mdl-38764450

ABSTRACT

This dataset presents a detailed description of the data and information used in the life-cycle assessment (LCA) of the Basque Y HSR line, which is a high-performance line for mixed traffic still under construction in 2023 (190 km). The LCI data presented in this paper support the original research carried out on whether the construction of the Basque Y HSR line infrastructure is justified in terms of reducing environmental impacts and energy consumption [1]. Life-cycle inventory (LCI) data related to the construction and maintenance phases of the infrastructure was collected using Google Earth tool following the information from stakeholder AHT gelditu [2], including the length of each item (bridges, tunnels, earthworks, railway tracks); and complemented with data obtained from the LCA carried out by Tuchschmid et al. [3]. LCI data associated with the operation phase of the infrastructure was built on passenger data for the years 2020, 2030, 2040 and 2049 available in ADIF [4], and freight data for the period of 2023-2050 available in the report by ADIF and the Basque Government [5]. Environmental impacts for transport modes were obtained from the ecoinvent v3.7 database [6,7] and processed with openLCA software [8]. Life-cycle impact assessment (LCIA) results gathered in the dataset include Global Warming (GWP100a), Cumulative Energy Demand and total emissions for PM10, SO2, NOX and NMVOC. Access to the explanation of these data allows any reader to reproduce the calculations of the main project and may be used as a baseline for future studies on transport economics too.

2.
Data Brief ; 36: 107006, 2021 Jun.
Article in English | MEDLINE | ID: mdl-34007866

ABSTRACT

A life cycle assessment (LCA) of the Spanish high speed rail (HSR) network in service in 2016 (2583 km) was conducted. Life cycle inventory (LCI) data related to the construction and maintenance phases of the infrastructure was collected using Google Earth tool, and complemented with data obtained from the LCA carried out by Tuchschmid et al. [1]. LCI data associated with the operation phase of the infrastructure was built on available fragmentary data on passenger movements for the year 2016 [2-4], processed with a python algorithm to estimate the transport service provided by the infrastructure. Environmental impacts for transport modes were obtained from Ecoinvent v3.7 database [5,6] and processed with openLCA software [7]. Life cycle impact assessment (LCIA) results gathered in the dataset include Global Warming (GWP100a), Cumulative Energy Demand and total emissions for PM10, SO2, NOX and NMVOC. This dataset presents a detailed description of the Spanish HSR network, including the length of each item (bridges, tunnels, earthworks, railway tracks), and a robust estimation of passenger transport over the infrastructure for year 2016. The LCI data presented in this paper support the original research done on whether the construction of Spanish HSR network infrastructure is justified in terms of reducing environmental impacts and energy consumption [8], and may be used as a baseline for future studies on transport economics.

SELECTION OF CITATIONS
SEARCH DETAIL
...