Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 5 de 5
Filter
Add more filters










Database
Language
Publication year range
1.
Rev Sci Instrum ; 87(2): 02A733, 2016 Feb.
Article in English | MEDLINE | ID: mdl-26931951

ABSTRACT

The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ∼50. A status of its assembly is proposed.

2.
Rev Sci Instrum ; 85(2): 02A946, 2014 Feb.
Article in English | MEDLINE | ID: mdl-24593525

ABSTRACT

The SPIRAL 2 facility, currently under construction, will provide either stable or radioactive beams at high intensity. In addition to the high intensity of stable beams, high charge states must be produced by the ion source to fulfill the RFQ LINAC injection requirements: Q/A = 1/3 at 60 kV ion source extraction voltage. Excepting deuterons and hydrogen, most of the stable beam requests concern metallic elements. The existing 18 GHz electron cyclotron resonance ion source (ECRIS) Phoenix V2 designed at LPSC Grenoble has been used for the tests and will be the source for the SPIRAL 2 commissioning. The tests performed at LPSC for calcium ((40)Ca(14+) and (40)Ca(16+)), nickel ((58)Ni(19+)), and sulfur ((32)S(11+)) are described and discussed. Due to the very high charge states required, the oven method has been chosen. An intensity of 1 pµA has been reached for those elements. The performance and the beam stability have been studied using different buffer gases, and some ionization efficiency preliminary results are given.

3.
Rev Sci Instrum ; 83(2): 02A339, 2012 Feb.
Article in English | MEDLINE | ID: mdl-22380186

ABSTRACT

A review of today achieved A∕Q = 3 heavy ions beams is proposed. The daily operation A∕Q = 3 ion beam intensities expected at Spiral2 are at the limit or above best record 3rd generation electron cyclotron resonance ion source (ECRIS) intensities. The necessity to build a new fully superconducting to fulfill these requirements is outlined. A discussion on the volume of the future source is proposed and the minimum value of 12 liters is derived. An analysis of the x-ray absorption superconducting ECRIS is presented based on VENUS experimental data and geometry. This study underlines the necessity to include a complete x-ray study at the time of source conception. The specifications foreseen for the new ECRIS are presented, followed with the roadmap for the design.

4.
Rev Sci Instrum ; 83(2): 02A915, 2012 Feb.
Article in English | MEDLINE | ID: mdl-22380256

ABSTRACT

The SPIRAL 2 facility is now under construction and will deliver either stable or radioactive ion beams. First tests of nickel beam production have been performed at GANIL with a new version of the large capacity oven, and a calcium beam has been produced on the heavy ion low energy beam transport line of SPIRAL 2, installed at LPSC Grenoble. For the production of radioactive beams, several target∕ion-source systems (TISSs) are under development at GANIL as the 2.45 GHz electron cyclotron resonance ion source, the surface ionization source, and the oven prototype for heating the uranium carbide target up to 2000 °C. The existing test bench has been upgraded for these developments and a new one, dedicated for the validation of the TISS before mounting in the production module, is under design. Results and current status of these activities are presented.

5.
Rev Sci Instrum ; 81(2): 02A316, 2010 Feb.
Article in English | MEDLINE | ID: mdl-20192337

ABSTRACT

The physics background requiring a very intense multicharged heavy ion source for Spiral2 is explained. The new Spiral2 low energy beam line dedicated to the heavy ions production and equipped with PHOENIX V2 ECRIS is presented. A status of the A-PHOENIX commissioning at 18 GHz is summarized. A new hybrid ECRIS concept with a cryogenic permanent magnet hexapole is proposed as an improvement of A-PHOENIX technology.

SELECTION OF CITATIONS
SEARCH DETAIL
...