Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 1 de 1
Filter
Add more filters










Database
Language
Publication year range
1.
Sci Rep ; 12(1): 19058, 2022 11 09.
Article in English | MEDLINE | ID: mdl-36351961

ABSTRACT

Based on a field monitored dataset measured at landfill #1 over 21 years, the characteristics of settlement coupling mechanical creep and biodegradation and the residual settlement were analyzed. Since landfill #1 is a multi-stage municipal solid waste (MSW) landfill where dykes are constructed after landfilling for subsequent waste fills, the waste decomposition between the lower and upper lifts was quite different and it is difficult to discern between the mechanical creep and bio-compression on the settlement curves. The compression ratio coupled with mechanical creep and bio-compression and the residual compression ratio were determined as 0.233 and 0.068, respectively. This implies that biodegradation was gradually and significantly reduced in the MSW settlement behavior after the residual settlement began. The starting date of residual settlement was distributed between 3821 and 5402 days from the initial date of landfilling. The settlement coupling mechanical creep and biodegradation (SMB) was 2.9 times larger than the residual settlement (SRS), and the duration of SMB is determined to be 0.3 times that of SRS. In addition, the remnant methane gas content existed in the landfill gas, and low-level biodegradation was still generated in the waste buried for more than 10 years after the residual settlement began.


Subject(s)
Refuse Disposal , Solid Waste , Solid Waste/analysis , Waste Disposal Facilities , Biodegradation, Environmental , Pressure
SELECTION OF CITATIONS
SEARCH DETAIL
...