Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 2 de 2
Filter
Add more filters










Database
Language
Publication year range
1.
Cureus ; 15(6): e41037, 2023 Jun.
Article in English | MEDLINE | ID: mdl-37519512

ABSTRACT

Background The intensive care unit (ICU) in a community hospital in southwest Minnesota saw a steady increase in central line-associated bloodstream infections (CLABSI) and an increase in the utilization of central lines. The baseline CLABSI rate was 11.36 at the start of the project, which was the highest in the last five years. The corresponding device utilization rate (DUR) was 64%, which increased from a pre-COVID pandemic rate of 45%. Aim The aim of this project was to decrease the ICU DUR by 37.5% from a baseline of 64% to 40% within six months without adversely impacting staff satisfaction. Methods A multidisciplinary team using the define, measure, analyze, improve, and control (DMAIC) methodology reviewed the potential causes of the increased use of central lines in the ICU. The team identified the following major causal themes: process, communication, education, and closed-loop feedback. Once the root causes were determined, suitable countermeasures were identified and implemented to address these barriers. These included reviewing current guidelines, enhanced care team rounding, staff education, and the creation of a vascular access indication algorithm. The team met biweekly to study the current state, determine the future state, evaluate feedback, and guide implementation. Results The pandemic saw a surge in the number of severely ill patients in the ICU, which may have caused an increase in the DUR. The project heightened the awareness of the increased DUR and its impact on the CLABSI rate. The initiation of discussion around this project led to an immediate decline in DUR via increased awareness and focus. As interventions were introduced and implemented, the DUR continued to decrease at a steady rate. Post implementation, the DUR met the project goal of less than 40%. The team continued to track progress and monitor feedback. The DUR continued to meet the goal for three months post implementation. Since the start of the project, there have been no CLABSI events reported. This effort has positively impacted safety and patient outcomes. Conclusions Through a defined process, the central line utilization rate in our ICU was decreased to 37.5% to meet the target goal and has been sustained.

2.
World J Virol ; 11(6): 394-398, 2022 Nov 25.
Article in English | MEDLINE | ID: mdl-36483101

ABSTRACT

The coronavirus disease 2019 pandemic had deleterious effects on the healthcare systems around the world. To increase intensive care units (ICUs) bed capacities, multiple adaptations had to be made to increase surge capacity. In this editorial, we demonstrate the changes made by an ICU of a midwest community hospital in the United States. These changes included moving patients that used to be managed in the ICU to progressive care units, such as patients requiring non-invasive ventilation and high flow nasal cannula, ST-elevation myocardial infarction patients, and post-neurosurgery patients. Additionally, newer tactics were applied to the processes of assessing oxygen supply and demand, patient care rounds, and post-ICU monitoring.

SELECTION OF CITATIONS
SEARCH DETAIL
...