Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 2 de 2
Filtrar
Mais filtros










Base de dados
Intervalo de ano de publicação
1.
Sci Total Environ ; 491-492: 118-22, 2014 Sep 01.
Artigo em Inglês | MEDLINE | ID: mdl-24704243

RESUMO

PCDD/F in exhaust gas emission samples was determined by the Environmental Agency of Apulia for a sinter plant located in Taranto (Italy) starting from June 2007 following an Agreement Act between plant owners and the Regional Government with the aim to assess and improve the environmental performances of the plant. The first two sampling campaigns yielded results ranging between 3.42 and 8.34 ng I-TE/Nm(3) that were soon considered revelatory of a high potential impact on the surrounding environment and the public, prompting for immediate action. As a first outcome, a Regional Regulation (LR 44/2008) was enforced in order to reduce PCDD/F emissions by plants operating in the metal sector, including sinter plants. After installation of a urea addition plant to the sinter mix as a process-integrated abatement technique the emissions ranged from 0.86 to 3.59 ng I-TE/Nm(3). In order to reach compliance to the newly introduced emission limit value of 0.4 ng I-TE/Nm(3) the urea plant was removed in favour of active-carbon injection as an end-of-pipe technique. Subsequently, during year 2011 emission values ranged from 0.095 to 1.97 ng I-TE/Nm(3), while in 2012 the observed range was 0.058 to 0.91 ng I-TE/Nm(3). As a better evaluation of the potential impact of the sinter plant emissions, a yearly mass-flow was estimated using exhaust gas PCDD/F concentrations and plant operational parameters (3.4 M Nm(3)/h). Mass-flow was estimated to be as high as 165 g I-TE/year for 2007 using yearly average concentrations or 248 g I-TE/year using the peak-value of 8.34 ng I-TE/Nm(3).


Assuntos
Poluentes Atmosféricos/análise , Poluição do Ar/estatística & dados numéricos , Monitoramento Ambiental , Metalurgia , Poluição do Ar/legislação & jurisprudência , Poluição do Ar/prevenção & controle , Benzofuranos/análise , Dibenzofuranos Policlorados , Política Ambiental , Itália , Dibenzodioxinas Policloradas/análogos & derivados , Dibenzodioxinas Policloradas/análise
2.
Water Res ; 38(7): 1799-808, 2004 Apr.
Artigo em Inglês | MEDLINE | ID: mdl-15026234

RESUMO

This work reports the main results of a bench scale membrane bioreactor operated for more than 100 days without sludge withdrawal and fed on real municipal wastewater. The experiments were oriented towards three main objectives. Firstly, the performance of the system was evaluated under two different volumetric loading rates (0.8 and 1.7 g CODL(react.)(-1)d(-1)). Secondly, biomass growth and accumulation of solids were assessed and a relationship between sludge concentration and volumetric loading rates was proposed. Thirdly, biomass activity was evaluated through respirometric tests, and endogenous and maximum respiration rates of heterotrophic and nitrifying bacteria were determined. The experimental campaign showed that these systems are easy to manage and very rapid to start-up. The SS concentrations under equilibrium conditions for both experimental periods were slightly lower than 10 times the volumetric loading rates, and the organic loading rates reached the same equilibrium value of 0.12 g CODgTSS(-1)d(-1). Furthermore, under equilibrium conditions the system showed very limited sludge production (0.12 g VSSgCOD(rem)(-1)) and low biomass activity, although it readily responded to load variations. Further work is being carried out to evaluate the performance over the long term.


Assuntos
Bactérias/crescimento & desenvolvimento , Reatores Biológicos , Esgotos/microbiologia , Eliminação de Resíduos Líquidos/métodos , Biomassa , Membranas Artificiais , Nitrogênio/metabolismo , Dinâmica Populacional , Esgotos/química
SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA
...