Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 3 de 3
Filtrar
Mais filtros










Intervalo de ano de publicação
1.
Comput Methods Programs Biomed ; 231: 107379, 2023 Apr.
Artigo em Inglês | MEDLINE | ID: mdl-36731311

RESUMO

BACKGROUND AND OBJECTIVE: One of the main tasks in a biobank consists in storing biological samples in a high-quality condition in order to future research. At moment, there exist many applications to manage a biobank. However, in general, these are web-based applications. In these web-based applications different tasks can be done. Among them, it is possible to remark the following: informed consent, confidentiality, non-profit, respect for quality and safety standards, including traceability of samples. In this paper, we describe a blockchain smart contract to ensure the traceability of the processes done in a biobank meaning a step forward to guarantee this traceability. METHODS: Use of blockchain technology to improve security, integrity and traceability of the processes carried out in a biobank. In particular IBM Hyperledger Fabric. RESULTS: As a result, a set of smart contracts have been developed describing the biobank processes. CONCLUSIONS: Improvement of the security, integrity, and traceability of samples in biobanks.


Assuntos
Blockchain , Bancos de Espécimes Biológicos , Software , Confidencialidade , Tecnologia
2.
Gac. sanit. (Barc., Ed. impr.) ; 26(1): 94-96, ene.-feb. 2012. tab
Artigo em Espanhol | IBECS | ID: ibc-98645

RESUMO

Objetivos Describir el proceso del día del traslado de un hospital general. Analizar el impacto en la actividad asistencial en los primeros meses después del traslado. Método Hospital general de ámbito comarcal, en Cataluña, que se traslada a un nuevo edifico. Se describe el proceso del traslado de los pacientes y se analiza el impacto en la actividad (se comparan 3 meses a partir del traslado [período 2] con los mismos meses del año anterior [período1]).Resultados Se trasladaron 37 pacientes sin incidencias. Se atendieron 18.786 urgencias en el período 1 y 21.266 en el período 2 (+13,2%). El número de ingresos urgentes/programados fue de 1314/803 en el período 1 y de 1427/979 en el período 2 (+8,59%/+21,91%). Las visitas realizadas en consultas externas fueron 32.116 en el período 1 y 30.777 en el período 2 (-4,16%)Conclusiones Una adecuada planificación y coordinación permitió realizar un traslado de hospital sin incidencias y sin reducir la actividad asistencial(AU)


Objectives To describe the moving day of a general hospital and to analyze the impact on clinical activity in the first few months after the move. Methods We describe the process of patient transfer and analyze the impact on activity of moving a regional general hospital in Catalonia (Spain) to a new building. Activity was compared in two periods: the first 3 months after the move (period 2) and the same 3 months in the previous year (period 1).Results We moved 37 patients without incidents. A total of 18,786 patients were admitted to the emergency room in period 1 and 21,266 were admitted in period 2 (+13.2%). The number of admissions from the emergency room vs elective admissions was 1,314/803 in period 1 and 1,427/979 in period 2 (+8.59%/ +21.91%). The number of outpatient visits in period 1 was 32,116 and 30,777 in period 2 (-4.16%).Conclusions Proper planning and coordination allowed the hospital to be moved without incidents and without decreasing activity(SU)


Assuntos
Humanos , Mudança das Instalações de Saúde/organização & administração , Hospitais Gerais/organização & administração , Atenção à Saúde/organização & administração , Planejamento de Assistência ao Paciente
3.
Gac Sanit ; 26(1): 94-6, 2012.
Artigo em Espanhol | MEDLINE | ID: mdl-22000111

RESUMO

OBJECTIVES: To describe the moving day of a general hospital and to analyze the impact on clinical activity in the first few months after the move. METHODS: We describe the process of patient transfer and analyze the impact on activity of moving a regional general hospital in Catalonia (Spain) to a new building. Activity was compared in two periods: the first 3 months after the move (period 2) and the same 3 months in the previous year (period 1). RESULTS: We moved 37 patients without incidents. A total of 18,786 patients were admitted to the emergency room in period 1 and 21,266 were admitted in period 2 (+13.2%). The number of admissions from the emergency room vs elective admissions was 1,314/803 in period 1 and 1,427/979 in period 2 (+8.59%/ +21.91%). The number of outpatient visits in period 1 was 32,116 and 30,777 in period 2 (-4.16%). CONCLUSIONS: Proper planning and coordination allowed the hospital to be moved without incidents and without decreasing activity.


Assuntos
Fechamento de Instituições de Saúde , Hospitais Gerais , Transferência de Pacientes/organização & administração , Transferência de Pacientes/normas , Humanos , Espanha
SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA
...