Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 2 de 2
Filtrar
Mais filtros










Base de dados
Intervalo de ano de publicação
1.
Rev Sci Instrum ; 90(1): 013302, 2019 Jan.
Artigo em Inglês | MEDLINE | ID: mdl-30709192

RESUMO

This paper describes the radio frequency (RF) measurement and tuning result of a 13 MeV Alvarez-type drift tube linac (DTL) for a compact pulsed hadron source (CPHS) at Tsinghua University. The design, machining, assembly, and alignment of the DTL are presented for integrity. The CPHS project consists of a high-current proton linac (13 MeV, 16 kW, peak current of 50 mA, 0.5 ms pulse width at 50 Hz), a neutron target station, a small-angle neutron scattering instrument, and a neutron imaging/radiology station. The linac contains an electron cyclotron resonance ion source, a low energy beam transport line, a four-vane radio frequency quadrupole (RFQ) accelerator, an Alvarez-type DTL, a high energy beam transport line, and a RF power supply and distributor. Construction on the CPHS started in June 2009, and the CPHS has provided 2000 h since 2013 to users with the neutrons produced by the 3 MeV proton beam from the radio frequency quadrupole bombarding on the beryllium target as an achievement of its mid-term objective. Presently, the tuning of the assembled DTL cavity has been completed successfully. The 4.3-m-long DTL consists of 40 accelerating cells, among which 39 full-length drift tubes (DTs) are suspended inside the cavity, and two half-length DTs are mounted inside the two end flanges of the cavity. Each DT contains a permanent magnet quadrupole. Thirteen post couplers and nine tuners are available for the tuning of the field. The relative error of the field after tuning is within ±1.6%, with a tilt sensitivity within ±33%/MHz in all cells. The beam energy will reach its designed value of 13 MeV after the DTL is installed in the beam line downstream the 3 MeV RFQ accelerator.

2.
Shanghai Kou Qiang Yi Xue ; 2(1): 28-31, 1993 Mar.
Artigo em Chinês | MEDLINE | ID: mdl-15159878

RESUMO

This study investigated the tissue compatibility of bone morphogenetic protein (BMP) /biologic ceramic/porous titanium implant,BMP/porous titanium implant,biologic ceramic/porous titanium implant and porous titanium implant by LM,SEM,EDXA.The results showed that the new bone formation and new bone mature were earlier in the BMP composite implants treated group.BMP uncomposite implants had no evident difference in the time of new bone formation, but the interface bonding ways had significant difference.

SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA
...