Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 2 de 2
Filtrar
Mais filtros










Base de dados
Intervalo de ano de publicação
1.
PLoS One ; 14(8): e0221341, 2019.
Artigo em Inglês | MEDLINE | ID: mdl-31437217

RESUMO

Single-point incremental forming (SPIF) is a technology that allows incremental manufacturing of complex parts from a flat sheet using simple tools; further, this technology is flexible and economical. Measuring the forming force using this technology helps in preventing failures, determining the optimal processes, and implementing on-line control. In this paper, an experimental study using SPIF is described. This study focuses on the influence of four different process parameters, namely, step size, tool diameter, sheet thickness, and feed rate, on the maximum forming force. For an efficient force predictive model based on an adaptive neuro-fuzzy inference system (ANFIS), an artificial neural network (ANN) and a regressions model were applied. The predicted forces exhibited relatively good agreement with the experimental results. The results indicate that the performance of the ANFIS model realizes the full potential of the ANN model.


Assuntos
Desenho Assistido por Computador/instrumentação , Indústria Manufatureira/métodos , Redes Neurais de Computação , Ligas/química , Alumínio/química , Desenho Assistido por Computador/estatística & dados numéricos , Lógica Fuzzy , Humanos , Indústria Manufatureira/instrumentação , Teste de Materiais
2.
ScientificWorldJournal ; 2014: 605198, 2014.
Artigo em Inglês | MEDLINE | ID: mdl-25610911

RESUMO

We focus on the two-center hybrid flow shop scheduling problem with identical parallel machines and removal times. The job removal time is the required duration to remove it from a machine after its processing. The objective is to minimize the maximum completion time (makespan). A heuristic and a lower bound are proposed for this NP-Hard problem. These procedures are based on the optimal solution of the parallel machine scheduling problem with release dates and delivery times. The heuristic is composed of two phases. The first one is a constructive phase in which an initial feasible solution is provided, while the second phase is an improvement one. Intensive computational experiments have been conducted to confirm the good performance of the proposed procedures.


Assuntos
Indústria Manufatureira/organização & administração , Modelos Teóricos
SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA
...