Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 3 de 3
Filtrar
Mais filtros










Base de dados
Intervalo de ano de publicação
1.
Water Environ Res ; 81(2): 165-72, 2009 Feb.
Artigo em Inglês | MEDLINE | ID: mdl-19323287

RESUMO

This article discusses key mechanisms involved in removing 1 mg/L Mn from synthetic wastewaters in constructed wetlands comprising water hyacinth (Eichhornia crassipes (Mart.) Solms) grown under different nutrient levels of 1-fold (28 mg/L and 7.7 mg/L of total nitrogen and total phosphorus, respectively), 2-fold, 1/4-fold, and 1/8-fold. A mass balance was carried out to evaluate the key removal mechanisms. Phytoremediation mainly due to phytoextraction substantially contributed to manganese removal. However, chemical precipitation was absent, suggesting that manganese has a higher solubility in the given average pH (6.2 to 7.1) conditions in constructed wetlands. Bacterial mediated immobilization mechanisms also did not contribute to manganese removal. Sediments constituted a minor sink to manganese, implying that manganese has a poor adsorption potential. Constructed wetlands comprising water hyacinth are effective at removing manganese from wastewaters despite the fact that the plants are grown under higher or lower nutrient conditions.


Assuntos
Eichhornia/metabolismo , Manganês/metabolismo , Poluentes Químicos da Água/metabolismo , Purificação da Água/métodos , Áreas Alagadas , Biodegradação Ambiental , Humanos , Resíduos Industriais
2.
J Environ Manage ; 87(3): 450-60, 2008 May.
Artigo em Inglês | MEDLINE | ID: mdl-17383797

RESUMO

Severe contamination of water resources including groundwater with iron (Fe) due to various anthropogenic activities has been a major environmental problem in industrial areas of Sri Lanka. Hence, the use of the obnoxious weed, water hyacinth (Eichhornia crassipes (Mart.) Solms) in constructed wetlands (floating aquatic macrophyte-based plant treatment systems) to phytoremediate Fe-rich wastewaters seems to be an appealing option. Although several studies have documented that hyacinths are good metal-accumulating plants none of these studies have documented the ability of this plant grown under different nutrient conditions to remove heavy metals from wastewaters. This paper, therefore, reports the phytoremediation efficiencies of water hyacinth grown under different nutrient conditions for Fe-rich wastewaters in batch-type constructed wetlands. This study was conducted for 15 weeks after 1-week acclimatization by culturing young water hyacinth plants (average height of 20+/-2cm) in 590L capacity fiberglass tanks under different nutrient concentrations of 1-fold [28 and 7.7mg/L of total nitrogen (TN) and total phosphorous (TP), respectively], 2-fold, 1/2-fold, 1/4-fold and 1/8-fold with synthetic wastewaters containing 9.27Femg/L. Another set-up of hyacinths containing only Fe as a heavy metal but without any nutrients (i.e., 0-fold) was also studied. A mass balance was carried out to investigate the phytoremediation efficiencies and to determine the different mechanisms governing Fe removal from the wastewaters. Fe removal was largely due to phytoremediation mainly through the process of rhizofiltration and chemical precipitation of Fe2O3 and FeOH3 followed by flocculation and sedimentation. However, chemical precipitation was more significant especially during the first 3 weeks of the study. Plants grown in the 0-fold set-up showed the highest phytoremediation efficiency of 47% during optimum growth at the 6th week with a highest accumulation of 6707Femg/kg dry weight. Active effluxing of Fe back to the wastewater at intermittent periods and with time was a key mechanism of avoiding Fe phytotoxicity in water hyacinth cultured in all set-ups. Our study elucidated that water hyacinth grown under nutrient-poor conditions are ideal to remove Fe from wastewaters with a hydraulic retention time of approximately 6 weeks.


Assuntos
Eichhornia/metabolismo , Recuperação e Remediação Ambiental/métodos , Ferro/isolamento & purificação , Eliminação de Resíduos Líquidos/métodos , Poluentes Químicos da Água/isolamento & purificação , Áreas Alagadas , Biodegradação Ambiental , Eichhornia/crescimento & desenvolvimento , Resíduos Industriais , Nitrogênio/metabolismo , Fósforo/metabolismo , Fatores de Tempo
3.
Artigo em Inglês | MEDLINE | ID: mdl-17182390

RESUMO

This article reports the phytoremediation efficiencies of water hyacinth (Eichhornia crassipes (Mart.) Solms) grown under different nutritional conditions for Al rich wastewaters in batch type constructed wetlands (floating aquatic macrophyte-based plant treatment systems). This study was conducted for 15 weeks after 1 week acclimatization by culturing young water hyacinth (average height of 20 +/- 2 cm) in 590 L capacity fiberglass tanks under different nutrient concentrations of 2-fold [56 and 15.4 mg/L of total nitrogen (TN) and total phosphorous (TP), respectively], 1-fold, 1/2-fold, 1/4-fold and 1/8-fold with synthetic wastewaters containing 5.62 Al mg/L. A control set-up of hyacinths comprising only Al with no nutrients was also studied. A mass balance was carried out to investigate the phytoremediation efficiencies and to identify the different Al removal mechanisms from the wastewaters. Chemical precipitation of Al(OH)3 was a dominant contribution to Al removal at the beginning of the study, whereas adsorption of Al3+ to sediments was observed to be a predominant Al removal mechanism as the study progressed. Phytoremediation mainly due to rhizofiltration was also an important mechanism of Al removal especially during the first 4 weeks of the study in almost all the set-ups. However, chemical precipitation and sediment adsorption of Al3+ was a dominant contribution to Al removal in comparison with phytoremediation. Plants cultured in the control set-up showed the highest phytoremediation efficiency of 63% during the period of the 4th week. A similar scenario was evident in the 1/8-fold set-up. Hence we conclude that water hyacinth grown under lower nutritional conditions are more ideal to commence a batch type constructed wetland treating Al rich wastewaters with a hydraulic retention time of approximately 4 weeks, after which a complete harvesting is recommended.


Assuntos
Alumínio/metabolismo , Eichhornia/metabolismo , Áreas Alagadas , Alumínio/análise , Alumínio/isolamento & purificação , Biodegradação Ambiental , Eichhornia/crescimento & desenvolvimento , Recuperação e Remediação Ambiental/métodos , Fatores de Tempo , Eliminação de Resíduos Líquidos/métodos , Poluição Química da Água/análise , Poluição Química da Água/prevenção & controle
SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA
...