Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 3 de 3
Filtrar
Mais filtros











Base de dados
Intervalo de ano de publicação
1.
J Environ Manage ; 277: 111425, 2021 Jan 01.
Artigo em Inglês | MEDLINE | ID: mdl-33017721

RESUMO

Land developers can apply biodiversity offsetting in different ways, from a project-by-project approach to a pooled and proactive approach, this latter appearing to provide greater advantages both in terms of implementation and of the No Net Loss objective. Incorporating landscape connectivity into the mitigation hierarchy is commonly recommended, but the benefits of pooling and anticipating offsets have never really been demonstrated from modeling approaches. Here, we compare connectivity gains from two different offsetting scenarios, when interconnections at offset sites are taken and not taken into account. Assuming that gains can be increased by optimizing the location of offsets, we identified sites where biodiversity offsetting generates the greatest ecological gains in habitat connectivity. The method was applied to a study case in the suburbs of Lyon (Southern France) using several representative species and the landscape functional connectivity model Graphab. Pooling biodiversity offsets led to additional gains in overall habitat connectivity of +103% on average, which we show can be further improved (+8%) by using a patch addition process available in Graphab to plan spatially and ecologically coherent offsetting areas. Pooling and anticipating biodiversity offsets in this way can help preserve the biodiversity and the functionality of natural environments at the territorial scale.


Assuntos
Biodiversidade , Conservação dos Recursos Naturais , Ecossistema , França
2.
J Environ Manage ; 243: 340-349, 2019 Aug 01.
Artigo em Inglês | MEDLINE | ID: mdl-31103679

RESUMO

Environmental policies and the objective of no net loss highlight the importance of preserving ecological networks to limit the fragmentation of natural habitats and biodiversity loss, especially due to urbanization. In the environmental impact assessment context, habitat connectivity and the spatio-temporal dynamics of biodiversity are crucial to obtaining reliable predictions that can support decision-making. We propose a methodological framework 1) to quantify the overall impact of a development project on the functioning of an ecological network, and 2) to select the best locations for implanting new habitat patches intended to enhance landscape connectivity. The amount of reachable habitat concept was applied to three representative terrestrial mammal species: the red squirrel, the Eurasian badger and the European hedgehog. All three species are recognized as vulnerable to human pressures and potentially affected by the construction of a new stadium in our study site, Lyon (Southern France). The method combines the species distribution model Maxent with the landscape functional connectivity model Graphab. The results showed that using any one of the avoidance and reduction measures on its own was unsuccessful in achieving the objective of no net loss when habitat connectivity is considered. However, the combination of new habitat patches and corridors offered a higher gain than distinct measures. This is especially important in the short term, when new hedgerow plantations have not yet developed enough to be used by the target species. Our findings indicate, first, the need to take the temporal scale into account in environmental impact assessment. We also show that applying the optimal scenario, constructed using a cumulative patch addition followed by a similar process testing a set of potential land-use changes, maximizes habitat connectivity. Our methodology provides a useful tool to increase target species' habitat connectivity within the mitigation hierarchy and to enhance development project design for increased environmental efficiency.


Assuntos
Conservação dos Recursos Naturais , Ecossistema , Animais , Biodiversidade , França , Mamíferos
3.
J Environ Manage ; 241: 439-449, 2019 Jul 01.
Artigo em Inglês | MEDLINE | ID: mdl-30975576

RESUMO

Environmental impact assessment (EIA) is performed to limit potential impacts of development projects on species and ecosystem functions. However, the methods related to EIA actually pay little attention to the landscape-scale effects of development projects on biodiversity. In this study we proposed a methodological framework to more properly address the landscape-scale impacts of a new stadium project in Lyon (France) on two representative mammal species exemplary for the endemic fauna, the red squirrel and the Eurasian badger. Our approach combined species distribution model using Maxent and landscape functional connectivity model using Graphab at two spatial scales to assess habitat connectivity before and after development project implementation. The development project had a negative impact on landscape connectivity: overall habitat connectivity (PC index) decreased by -6.8% and -1.8% and the number of graph components increased by +60.0% and +17.6% for the red squirrel and the European badger respectively, because some links that formerly connected habitat patches were cut by the development project. Changes affecting landscape structure and composition emphasized the need to implement appropriate avoidance and reduction measures. Our methodology provides a useful tool both for EIA studies at each step of the way to support decision-making in landscape conservation planning. The method could be also developed in the design phase to compare the effectiveness of different avoidance or mitigation measures and resize them if necessary to maximize habitat connectivity.


Assuntos
Conservação dos Recursos Naturais , Ecossistema , Animais , Biodiversidade , França
SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA