Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 2 de 2
Filtrar
Mais filtros










Base de dados
Intervalo de ano de publicação
1.
Pediatr Radiol ; 48(13): 1867-1874, 2018 12.
Artigo em Inglês | MEDLINE | ID: mdl-30159593

RESUMO

BACKGROUND: Incident reporting can be used to inform imaging departments about adverse events and near misses. OBJECTIVE: To study incident reports submitted during a 5-year period at a large pediatric imaging system to evaluate which imaging modalities and other factors were associated with a greater rate of filed incident reports. MATERIALS AND METHODS: All incident reports filed between 2013 and 2017 were reviewed and categorized by modality, patient type (inpatient, outpatient or emergency center) and use of sedation/anesthesia. The number of incident reports was compared to the number of imaging studies performed during that time period to calculate an incident report rate for each factor. Statistical analysis of whether there were differences in these rates between factors was performed. RESULTS: During the study period, there were 2,009 incident reports filed and 1,071,809 imaging studies performed for an incident report rate of 0.19%. The differences in rates by modality were statistically significant (P=0.0001). There was a greater rate of incident reports in interventional radiology (1.54%) (P=0.0001) and in magnetic resonance imaging (MRI) (0.62%) (P=0.001) as compared to other imaging modalities. There was a higher incident report rate for inpatients (0.34%) as compared to outpatient (0.1%) or emergency center (0.14%) (P=0.0001). There was a higher rate of incident reports for patients under sedation (1.27%) as compared to non-sedated (0.12%) (P=0.0001). CONCLUSION: Using incident report rates as a proxy for potential patient harm, the areas of our pediatric radiology service that are associated with the greatest potential for issues are interventional radiology, sedated patients, and inpatients. The areas associated with the least risk are ultrasound (US) and radiography. Safety improvement efforts should be focused on the high-risk areas.


Assuntos
Diagnóstico por Imagem , Gestão de Riscos , Criança , Feminino , Humanos , Masculino , Segurança do Paciente , Estudos Retrospectivos , Medição de Risco , Fatores de Risco , Texas
2.
Pediatr Radiol ; 47(1): 22-30, 2017 Jan.
Artigo em Inglês | MEDLINE | ID: mdl-27771747

RESUMO

BACKGROUND: Because of the increasing complexities of providing imaging for pediatric health care services, a more reliable process to manage the daily delivery of care is necessary. Objective We describe our Daily Readiness Huddle and the effects of the process on problem identification and improvement. MATERIALS AND METHODS: Our Daily Readiness Huddle has four elements: metrics review, clinical volume review, daily readiness assessment, and problem accountability. It is attended by radiologists, directors, managers, front-line staff with concerns, representatives from support services (information technology [IT] and biomedical engineering [biomed]), and representatives who join the meeting in a virtual format from off-site locations. Data are visually displayed on erasable whiteboards. The daily readiness assessment uses queues to determine whether anyone has concerns or outlier data in regard to S-MESA (Safety, Methods, Equipment, Supplies or Associates). Through this assessment, problems are identified and categorized as quick hits (will be resolved in 24-48 h, not requiring project management) and complex issues. Complex issues are assigned an owner, quality coach and report-back date. Additionally, projects are defined as improvements that are often strategic, are anticipated to take more than 60 days, and do not necessarily arise out of identified issues during the Daily Readiness Huddle. We tracked and calculated the mean, median and range of days to resolution and completion for complex issues and for projects during the first full year of implementing this process. RESULTS: During the first 12 months, 91 complex issues were identified and resolved, 11 projects were in progress and 33 completed, with 23 other projects active or in planning. Time to resolution of complex issues (in days) was mean 37.5, median 34.0, and range 1-105. For projects, time to completion (in days) was mean 86.0, median 84.0, and range 5-280. CONCLUSION: The Daily Readiness Huddle process has given us a framework to rapidly identify issues, bring accountability to problem-solving, and foster improvement. It has also had a positive effect on team-building and coordination.


Assuntos
Atenção à Saúde/organização & administração , Equipe de Assistência ao Paciente/organização & administração , Pediatria/organização & administração , Resolução de Problemas , Melhoria de Qualidade , Radiologia/organização & administração , Humanos
SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA
...