Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 1 de 1
Filtrar
Mais filtros










Base de dados
Intervalo de ano de publicação
1.
Biotechnol Lett ; 28(1): 45-50, 2006 Jan.
Artigo em Inglês | MEDLINE | ID: mdl-16369874

RESUMO

Dried milled biomass of Azolla filiculoides removed up to 98.2% of gold from wastewater from a gold plating factory containing 5 mg gold/l in solution in batch biosorption. The gold uptake capacity of the biomass was 98 mg/g. Whole dried biomass used in a continuous flow column removed up to 100% of gold from diluted wastewater. A similar column was linked to a sulphide precipitation process to provide a two-step system which was able to remove 98% of gold from undiluted wastewater containing 41 mg Au/l. The lifetime of the column was five days.


Assuntos
Biomassa , Gleiquênias , Ouro/isolamento & purificação , Resíduos Industriais , Eliminação de Resíduos Líquidos/métodos , Purificação da Água/métodos , Adsorção , Biodegradação Ambiental
SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA
...