Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 1 de 1
Filtrar
Mais filtros










Base de dados
Intervalo de ano de publicação
1.
J Environ Manage ; 87(3): 329-40, 2008 May.
Artigo em Inglês | MEDLINE | ID: mdl-17412479

RESUMO

The concentrations of sediment and turbidity in stream water were monitored during culvert removals to determine the short term effects of road obliteration. Sediment concentration was measured at 11 stream crossings among two locations in Idaho and one in Washington. Sediment concentration immediately below the culvert outlet exceeded levels above the culvert outlet by at least three orders of magnitude at all stream crossings. Sediment yields ranged from 170 to less than 1kg in the 24-h period following culvert removal. Turbidity exceeded the regulatory limits during culvert removal at all locations monitored in this study and remained above the limits beyond the monitoring periods of 24h at four of the locations. Sediment concentrations 100m downstream of the culvert outlet were reduced by an order of magnitude, but did not change the turbidity values sufficiently to meet regulatory limits. Sediment concentrations an average of 810m downstream of the culvert outlet were similar to sediment concentrations above the culvert for the entire excavation period and turbidity regulations were met. Mitigation consisting of two straw bales placed in the stream caused a significant reduction in sediment yield from an average of 67kg to an average of 1.6kg.


Assuntos
Monitoramento Ambiental/métodos , Sedimentos Geológicos/análise , Nefelometria e Turbidimetria/métodos , Movimentos da Água , Abastecimento de Água/análise , Monitoramento Ambiental/estatística & dados numéricos , Geografia , Idaho , Nefelometria e Turbidimetria/estatística & dados numéricos , Medição de Risco , Rios , Fatores de Tempo , Washington
SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA
...