Your browser doesn't support javascript.
loading
To study and structure a preliminary indicators system for evaluating the projects of Hospital in finished phase / 中华医学科研管理杂志
Article in Chinese | WPRIM (Western Pacific) | ID: wpr-442201
Responsible library: WPRO
ABSTRACT
Objective To structure a preliminary indicators system for evaluating the projects of Hospital in finished phase.Methods With Delphi method,collect the experts' opinion of the importance of every item.With AHP (Analytic hierarchy process) method,calculate the weight coefficient of every item.Results The positivity of the experts was fine; The authority coefficient of two rounds were 0.859 and 0.833,the consultation results are reliable; The coordination coefficient of two rounds were 0.254 and 0.553,according to the significance test,p values were less than 0.05,indicating that the results were desirable.According to the score of every item,we got the weight index of every items based on the AHP method.Finally we structure the indicators system including 3 primary indicators and 10 secondary indicators.Conclusion The preliminary results of this study provide a reference for the performance evaluation of projects in finished phase of China-Japan Friendship Hospital.

Full text: Available Database: WPRIM (Western Pacific) Language: Chinese Journal: Chinese Journal of Medical Science Research Management Year: 2013 Document type: Article
Full text: Available Database: WPRIM (Western Pacific) Language: Chinese Journal: Chinese Journal of Medical Science Research Management Year: 2013 Document type: Article
...