Ergonomics program management in Tucuruí Hydropower Plant using TPM methodology.
Work
; 41 Suppl 1: 2822-30, 2012.
Article
em En
| MEDLINE
| ID: mdl-22317147
This paper aims to present the benefits achieved in the ergonomics process management with the use of the TPM methodology (Total Productive Maintenance) in Tucuruí Hydropower Plant. The methodology is aligned with the corporate guidelines, moreover with the Strategic Planning of the company, it is represented in the TPM Pillars including the Health Pillar in which is inserted the ergonomics process. The results of the ergonomic actions demonstrated a 12% reduction over the absenteeism rate due to musculoskeletal disorders, solving 77,0% of ergonomic non-conformities, what favored the rise of the Organizational Climate in 44,8%, impacting on the overall performance of the company. Awards confirmed the success of the work by the achievement of the Award for TPM Excellence in 2001, Award for Excellence in Consistent TPM Commitment in 2009 and more recently the Special Award for TPM Achievement, 2010. The determination of the high rank administration and workers, allied with the involvement/dynamism of Pillars, has assured the success of this management practice in Tucuruí Hydropower Plant.
Texto completo:
1
Coleções:
01-internacional
Base de dados:
MEDLINE
Assunto principal:
Centrais Elétricas
/
Saúde Ocupacional
/
Ergonomia
Tipo de estudo:
Guideline
Aspecto:
Determinantes_sociais_saude
Limite:
Humans
País/Região como assunto:
America do sul
/
Brasil
Idioma:
En
Revista:
Work
Assunto da revista:
MEDICINA OCUPACIONAL
Ano de publicação:
2012
Tipo de documento:
Article
País de afiliação:
Brasil
País de publicação:
Holanda